Smurfit Kappa – FEP, Nettingsdorf

• Start Up: 2020
• Technology: Black Liquor Boiler
• Capacity: 180 t/h stream

Client: Smurfit Kappa Nettingsdorf, A in cooperation with UVP – Environmental Management an Engineering

Supply of Services: Contract specifications, Supervision of engineering, incl. side projects MVR, NG supply, caustizising

ČKD DIZ – Zevo Chotikov, Pilsen

• Start Up: 2015
• Technology: Reverse Acting Grate
• Waste Capacity: 95.000 t/a
• Capacity: 38 MW (thermal)

Client: ČKD DIZ; CZ

              Plzeňská teplárenská, a.s; CZ

Supply of Services: Supervision of Commissioning

Linz AG – Modification of steam turbine

• Start up: 2014
• Technology: Steam turbine- Modification of steam parameters, Increase of District Heating Capacity
• Capacity: 15 MW el., 50 MW th.
• Investment: 2 Mio. Euro

Client: Linz AG

Supply of Services: Preparation of tender documents, Contract specifications, Supervision of engineering and commissioning

Seca s.r.o. – Biomass boiler ORC cycle

• Start Up: 2012
• Technology: Biomass grate boiler, ORC cycle
• Capacity: 6 MW
• Investment: 8 Mio. Euro

Client: Seca s.r.o. CZ

Supply of Services: Supervision and optimization of operation, Modification of heat distribution

Linz AG – RHKW Linz

• Start Up: 2011
• Technology: Fluidized Bed Combustion
Waste Capacity: 150.000 t/a + Sewage Sludge
• Capacity: 66 MW
• Investment: 145 Mio. Euro (incl. waste pretreatment and cooling tower)

Client: Linz AG in cooperation with UVP – Environmental Management an Engineering

Supply of Services: Contract Specifications, Project Management, Supervision

Linz AG – Cooling Tower

• Start Up: 2010
• Technology: forced draft cooling tower (3 cells)
• Capacity: 120 MW
• Investment: 2,4 Mio. Euro (exkl. civill)

Client: Linz AG in cooperation with UVP – Environmental Management an Engineering

Supply of Services: Contract Specifications, Project Management, Supervision of Erection and Commissioning

Fernwärme Wien – Harzardous Waste Treatment

Plant modification, explosion prevention

• Start Up: 2009
• Technology: Rotary Shear for Homogenisation

Client: Fernwärme Wien GmbH

Supply of Services: Safety Engineering, Contract Specifications

Fernwärme Wien – Shredder

• Start Up: 2009
• Technology: Rotary Shear
• Waste Capacity: 15 t/h

Client: Fernwärme Wien GmbH

Supply of Services: Engineering, Contract Specifications, Supervision of Erection and Commissioning

Eybl Austria GmbH – thermal afterburning "Flammkaschierung"

• Start Up: 2005
• Technology: Regenerative Thermal Oxidation (RTO)
• Capacity: 22.000 m3 (n)/h

Client: Eybl Austria GmbH in cooperation with UVP – Environmental Management an Engineering

Supply of Services: Engineering, Contract Specifications, Supervision of Erection and Commissioning

Staatspreis für Umwelt- und Energietechnologie 2008

Fernwärme Wien – WSO 4

• Start Up: 2003
• Technology: Fluidised Bed Combustion
• Waste Capacity: 100.000 t/a + Sewage Sludge
• Capacity: 38 MW
• Investment: 58 Mio. Euro

Client: Integral Energie- und Umwelttechnik

Supply of Services: Commissioning, Supervision of Operation, Operation Training

Fernwärme Wien – Battery Recycling

• Start Up: 2002
• Technology: Rotary Kiln
• Waste Capacity: 2.000 t/a

Client: Fernwärme Wien GmbH

Supply of Services: Commissioning, Supervision of Operation, Operation Training

FINEX POSCO – Fine Ore Smelting Reduction

• Start Up: 1999/2001
• Technology: Fluidized Bed
• Capacity: 150 – 2.000 t/d

Client: Siemens VAI

Supply of Services: R&D projects, Basic and Detail Engineering, Supervision of Commissioning and Operation