Smurfit Kappa – FEP, Nettingsdorf
• Start Up: 2020
• Technology: Black Liquor Boiler
• Capacity: 180 t/h stream
Client: Smurfit Kappa Nettingsdorf, A in cooperation with
Supply of Services: Contract specifications, Supervision of engineering, incl. side projects MVR, NG supply, caustizising
ČKD DIZ – Zevo Chotikov, Pilsen
• Start Up: 2015
• Technology: Reverse Acting Grate
• Waste Capacity: 95.000 t/a
• Capacity: 38 MW (thermal)
Linz AG – Modification of steam turbine
• Start up: 2014
• Technology: Steam turbine- Modification of steam parameters, Increase of District Heating Capacity
• Capacity: 15 MW el., 50 MW th.
• Investment: 2 Mio. Euro
Client: Linz AG
Supply of Services: Preparation of tender documents, Contract specifications, Supervision of engineering and commissioning
Seca s.r.o. – Biomass boiler ORC cycle
• Start Up: 2012
• Technology: Biomass grate boiler, ORC cycle
• Capacity: 6 MW
• Investment: 8 Mio. Euro
Client: Seca s.r.o. CZ
Supply of Services: Supervision and optimization of operation, Modification of heat distribution
Linz AG – RHKW Linz
• Start Up: 2011
• Technology: Fluidized Bed Combustion
• Waste Capacity: 150.000 t/a + Sewage Sludge
• Capacity: 66 MW
• Investment: 145 Mio. Euro (incl. waste pretreatment and cooling tower)
Client: Linz AG in cooperation with
Supply of Services: Contract Specifications, Project Management, Supervision
Linz AG – Cooling Tower
• Start Up: 2010
• Technology: forced draft cooling tower (3 cells)
• Capacity: 120 MW
• Investment: 2,4 Mio. Euro (exkl. civill)
Client: Linz AG in cooperation with
Supply of Services: Contract Specifications, Project Management, Supervision of Erection and Commissioning
Fernwärme Wien – Harzardous Waste Treatment
Plant modification, explosion prevention
• Start Up: 2009
• Technology: Rotary Shear for Homogenisation
Client: Fernwärme Wien GmbH
Supply of Services: Safety Engineering, Contract Specifications
Fernwärme Wien – Shredder
• Start Up: 2009
• Technology: Rotary Shear
• Waste Capacity: 15 t/h
Client: Fernwärme Wien GmbH
Supply of Services: Engineering, Contract Specifications, Supervision of Erection and Commissioning
Eybl Austria GmbH – thermal afterburning "Flammkaschierung"
• Start Up: 2005
• Technology: Regenerative Thermal Oxidation (RTO)
• Capacity: 22.000 m3 (n)/h
Fernwärme Wien – WSO 4
• Start Up: 2003
• Technology: Fluidised Bed Combustion
• Waste Capacity: 100.000 t/a + Sewage Sludge
• Capacity: 38 MW
• Investment: 58 Mio. Euro
Client: Integral Energie- und Umwelttechnik
Supply of Services: Commissioning, Supervision of Operation, Operation Training
Fernwärme Wien – Battery Recycling
• Start Up: 2002
• Technology: Rotary Kiln
• Waste Capacity: 2.000 t/a
Client: Fernwärme Wien GmbH
Supply of Services: Commissioning, Supervision of Operation, Operation Training
FINEX POSCO – Fine Ore Smelting Reduction
• Start Up: 1999/2001
• Technology: Fluidized Bed
• Capacity: 150 – 2.000 t/d
Client: Siemens VAI
Supply of Services: R&D projects, Basic and Detail Engineering, Supervision of Commissioning and Operation